| 1. Week |
Reading the architectural project |
Preparation, After Class Study, Research, Other Activities, Practice
|
| 1. Week |
Reading the architectural project |
Research, Practice, Preparation, After Class Study, Other Activities
|
| 2. Week |
Basic elements of the ventilation installation project |
Other Activities, Research, Preparation, After Class Study, Practice
|
| 2. Week |
Basic elements of the ventilation installation project |
Practice, Preparation, After Class Study, Research, Other Activities
|
| 3. Week |
Drawing of basic ventilation installation symbols |
Practice, Research, Preparation, After Class Study, Other Activities
|
| 3. Week |
Drawing of basic ventilation installation symbols |
Other Activities, Practice, Research, Preparation, After Class Study
|
| 4. Week |
Drawing of the ventilation installation floor plan |
Research, Practice, Other Activities, Preparation, After Class Study
|
| 4. Week |
Drawing of the ventilation installation floor plan |
Other Activities, Practice, Research, Preparation, After Class Study
|
| 5. Week |
Drawing of ventilation installation column line |
Research, Other Activities, Preparation, After Class Study, Practice
|
| 5. Week |
Drawing of ventilation installation column line |
Preparation, After Class Study, Practice, Research, Other Activities
|
| 6. Week |
Detail of ventilation installation end elements drawings |
Research, Other Activities, Practice, Preparation, After Class Study
|
| 6. Week |
Detail of ventilation installation end elements drawings |
Preparation, After Class Study, Research, Other Activities, Practice
|
| 7. Week |
Air handling unit/cooling coil detail drawings |
Preparation, After Class Study, Research, Other Activities, Practice
|
| 7. Week |
Air handling unit/cooling coil detail drawings |
Preparation, After Class Study, Other Activities, Practice, Research
|
| 8. Week |
Chiller/water tower detail drawings |
Research, Other Activities, Preparation, After Class Study, Practice
|
| 8. Week |
Chiller/water tower detail drawings |
Preparation, After Class Study, Other Activities, Research, Practice
|
| 9. Week |
Engine room installation detail drawings |
Preparation, After Class Study, Research, Other Activities, Practice
|
| 9. Week |
Engine room installation detail drawings |
Research, Practice, Other Activities, Preparation, After Class Study
|
| 10. Week |
Engine room installation detail drawings |
Practice, Research, Other Activities, Preparation, After Class Study
|
| 10. Week |
Engine room installation detail drawings |
Other Activities, Practice, Research, Preparation, After Class Study
|
| 11. Week |
Cooling system flow with element symbols Reading and drawing diagrams |
Other Activities, Practice, Preparation, After Class Study, Research
|
| 11. Week |
Cooling system flow with element symbols Reading and drawing diagrams |
Preparation, After Class Study, Practice, Other Activities, Research
|
| 12. Week |
Refrigeration equipment installation isometric diagram drawing |
Preparation, After Class Study, Research, Other Activities, Practice
|
| 12. Week |
Refrigeration equipment installation isometric diagram drawing |
Preparation, After Class Study, Other Activities, Practice, Research
|
| 13. Week |
Drawing of cold room isometric diagrams |
Preparation, After Class Study, Research, Other Activities, Practice
|
| 13. Week |
Drawing of cold room isometric diagrams |
Preparation, After Class Study, Other Activities, Research, Practice
|
| 14. Week |
Drawing of cold storage isometric schemes |
Practice, Research, Other Activities, Preparation, After Class Study
|
| 14. Week |
Drawing of cold storage isometric schemes |
Research, Other Activities, Preparation, After Class Study, Practice
|