Course Title | Code | Semester | L+U Hour | Credits | ECTS |
---|---|---|---|---|---|
- | ELK1107 | 1. Semester | 2 + 0 | 2.0 | 3.0 |
Prerequisites | None |
Language of Instruction | Turkish |
Course Level | Associate |
Course Type | |
Mode of delivery | Face to face |
Course Coordinator |
Lect. Dr. Beytullah BOZALİ |
Instructor(s) |
Beytullah BOZALİ |
Assistants | |
Goals | This lesson is aimed to acquire the qualifications for the introduction and the assembly processes of all kinds of high voltage network materials. |
Course Content | This lesson will discuss the necessary feasibility studies in electrical power transmission and distribution lines, installation and maintenance of poles, insulators, and other elements by taking necessary safety precautions |
Learning Outcomes |
- Makes necessary feasibility studies on electrical energy transmission and distribution lines. - Gives and installs materials of high voltage networks - Defects in switchgear systems are eliminated |
Week | Topics | Learning Methods |
---|---|---|
1. Week | direct mount | Course Hours Research Other Activities Preparation, After Class Study |
2. Week | Mounting Brackets, Brackets to Posts | Research Other Activities Preparation, After Class Study Course Hours |
3. Week | Installation of insulator and other elements | Other Activities Preparation, After Class Study Course Hours Research |
4. Week | Pulling and Connecting Overhead Line Conductors | Course Hours Preparation, After Class Study Research Other Activities |
5. Week | Maintenance of poles, equipment and lines | Research Course Hours Other Activities Preparation, After Class Study |
6. Week | ENH malfunctions occur | |
7. Week | Power Transformer installation | Other Activities Preparation, After Class Study Research Course Hours |
8. Week | Installation of the measuring transformer | Research Other Activities Preparation, After Class Study Course Hours |
9. Week | Installation of busbar system | Research Other Activities Preparation, After Class Study Course Hours |
10. Week | To install the separator | Preparation, After Class Study Course Hours Research Other Activities |
11. Week | To install the breaker | Research Preparation, After Class Study Course Hours Other Activities |
12. Week | Faults in switchgear systems | Preparation, After Class Study Course Hours Research Other Activities |
13. Week | Maintenance of Panel and Measurement Systems | Other Activities Course Hours Research Preparation, After Class Study |
14. Week | Maintenance of Panel and Measurement Systems | Other Activities Course Hours Research Preparation, After Class Study |
Course notes |
Program Requirements | Contribution Level | DK1 | DK2 | DK3 | Measurement Method |
---|---|---|---|---|---|
PY1 | 5 | 5 | 5 | 5 | 40,60 |
PY11 | 5 | 5 | 5 | 5 | 40,60 |
0 | 1 | 2 | 3 | 4 | 5 | |
---|---|---|---|---|---|---|
Course's Level of contribution | None | Very Low | Low | Fair | High | Very High |
Method of assessment/evaluation | Written exam | Oral Exams | Assignment/Project | Laboratory work | Presentation/Seminar |
Event | Quantity | Duration (Hour) | Total Workload (Hour) |
---|---|---|---|
Course Hours | 14 | 2 | 28 |
Preparation, After Class Study | 14 | 1 | 14 |
Research | 7 | 1 | 7 |
Other Activities | 6 | 1 | 6 |
Midterm 1 | 1 | 1 | 1 |
Homework 1 | 14 | 1 | 14 |
Final | 1 | 7 | 7 |
Total Workload | 77 | ||
ECTS Credit of the Course | 3.0 |