Course Title | Code | Semester | L+U Hour | Credits | ECTS |
---|---|---|---|---|---|
Production Planning | AEM300 | 6. Semester | 3 + 0 | 3.0 | 5.0 |
Prerequisites | None |
Language of Instruction | Turkish |
Course Level | Undergraduate |
Course Type | |
Mode of delivery | Required |
Course Coordinator | |
Instructor(s) |
Hasan Hüseyin CİRİTCİOĞLU |
Assistants | |
Goals | Perform advanced production planning activities for the wood product industry. |
Course Content | The students who complete this course successfully; • Demand and Capacity Forecast. • Facility location selection • Facility layout planning. • Product process design, work-flow plans, creating the production line. • Inventory planning and management. • Production scheduling. |
Learning Outcomes |
- Demand and Capacity Forecast. - Facility location selection - Facility layout planning. - Product process design, work-flow plans, creating the production line. - Inventory planning and management. - Production scheduling. |
Week | Topics | Learning Methods |
---|---|---|
1. Week | Basic concepts about production and production systems. | |
2. Week | Advantages and disadvantages of different production systems. | |
3. Week | Demand and capacity forecasting methods. Simple averages, exponential smoothing, time series analysis, etc. | |
4. Week | Facility location problems and the factors affecting the selection of location. Methods used in the selection of plant location. | |
5. Week | Product process design, work-flow plans, creating the production line. Basic process scheme preparation. | |
6. Week | Inventory control and management, basic concepts. | |
7. Week | Inventory management policies. | |
8. Week | Model of basic economic order quantity. | |
9. Week | Activities of production scheduling. Gantt Chart. | |
10. Week | Bottleneck analysis. | |
11. Week | Investment comparison analysis. | |
12. Week | SWOT Analysis | |
13. Week | Modern production methods and production planning activities | |
14. Week | Serial production lines example application for furniture plant 3 |
Nahmias, S., Production and Operation Analysis, McGraw-Hill/Irwin; 4 edition 2000. |
• Aksin, R.G., Stanridge, C.R., Modeling and Analysis of Manufacturing Systems, John Wiley and Sons. (1993) |
Siper, D., B, R.L., Production Planning, Control, and Integration, McGraw-Hill. (1997) |
Vollmann, E., Wybark, D.C., Manufacturing Planning and Control Systems, McGraw- Hill (1993). |
Tekin, M., (2007), Üretim Yönetimi, Detay Yayıncılık, Ankara |
• İlhan, R., Burdurlu, E., Ağaçişleri Endüstrisinde Fabrika Planlaması, , Ankara, 1993. |
Program Requirements | Contribution Level | DK1 | DK2 | DK3 | DK4 | DK5 | DK6 | Measurement Method |
---|
0 | 1 | 2 | 3 | 4 | 5 | |
---|---|---|---|---|---|---|
Course's Level of contribution | None | Very Low | Low | Fair | High | Very High |
Method of assessment/evaluation | Written exam | Oral Exams | Assignment/Project | Laboratory work | Presentation/Seminar |
Event | Quantity | Duration (Hour) | Total Workload (Hour) |
---|---|---|---|
Midterm 1 | 1 | 3 | 3 |
Homework 1 | 5 | 6 | 30 |
Homework 2 | 5 | 6 | 30 |
Final | 1 | 3 | 3 |
Practice | 3 | 6 | 18 |
Classroom Activities | 14 | 3 | 42 |
Total Workload | 126 | ||
ECTS Credit of the Course | 5.0 |